Canaveral Lock Resumes Normal Operations After Repair Work on Tuesday

By  //  September 14, 2021

repair work included replacing an operating cable on the eastern gates

Officials announced on Tuesday that the Canaveral Lock has resumed normal operations after a successful change of drive cable on one of the lock gates. (Port Canaveral Image)

BREVARD COUNTY • PORT CANAVERAL, FLORIDA – Officials announced on Tuesday that the Canaveral Lock has resumed normal operations after a successful change of drive cable on one of the lock gates.

The Canaveral Lock maintenance closure was announced on Monday to replace an operating cable on the eastern gates.

The closure was scheduled for Tuesday, Sept 14 from 9:30 a.m.- 2:00 p.m.