NASA Engineers Assess Data After Artemis 1 Scrub, Mission Managers to Meet Tuesday Afternoon

By  //  August 30, 2022

earliest possible launch opportunity is Friday during a two-hour window that opens at 12:48 p.m

NASA engineers are evaluating data gathered during the Artemis I launch attempt Monday, Aug. 29, when teams could not get the rocket’s engines to the proper temperature range required to start the engines at liftoff and ran out of time in the two-hour launch window to continue. While managers have not yet set a date for the next launch attempt, the earliest possible opportunity is Friday, Sept. 2, during a two-hour launch window that opens at 12:48 p.m.

SCRUBBED! Artemis 1 Moon Mission Launch Postponed By NASA Until No Earlier Than FridayRelated Story:
SCRUBBED! Artemis 1 Moon Mission Launch Postponed By NASA Until No Earlier Than Friday

BREVARD COUNTY • KENNEDY SPACE CENTER, FLORIDA – NASA engineers are evaluating data gathered during the Artemis I launch attempt Monday, Aug. 29, when teams could not get the rocket’s engines to the proper temperature range required to start the engines at liftoff and ran out of time in the two-hour launch window to continue.

While managers have not yet set a date for the next launch attempt, the earliest possible opportunity is Friday, Sept. 2, during a two-hour launch window that opens at 12:48 p.m.

The mission management team will convene Tuesday afternoon to discuss the data and develop a plan forward. 

The Space Launch System’s four RS-25 engines must be thermally conditioned before super cold propellant begins flowing through them for liftoff.

Launch controllers condition them by increasing the pressure on the core stage liquid hydrogen tank to route, or “bleed” as it is often called, a portion of the approximately minus 423 F liquid hydrogen to the engines.

Managers suspect the issue, seen on engine 3, is unlikely to be the result of a problem with the engine itself. 

During the countdown, launch controllers worked through several additional issues, including storms in the area that delayed the start of propellant loading operations, a leak at the quick disconnect on the 8-inch line used to fill and drain core stage liquid hydrogen, and a hydrogen leak from a valve used to vent the propellant from the core stage intertank. 

 NASA will host a media teleconference Tuesday, Aug. 30, at approximately 6 p.m. EDT to provide an update on data analysis and discussions. The time is subject to change.

STAY TUNED TO SPACE COAST DAILY FOR ARTEMIS UPDATES

Artemis 1 launch coverage is brought to you by Erdman Automotive, Eastern Florida State College, Health First and All Points.

Space Launch Delta 45 Meteorologists Predict 70% Chance of Favorable Weather for Artemis Launch on MondayRelated Story:
Space Launch Delta 45 Meteorologists Predict 70% Chance of Favorable Weather for Artemis Launch on Monday
NASA’s Artemis 1 Moon Shot is ‘Go’ for Monday Morning Launch from Kennedy Space CenterRelated Story:
NASA’s Artemis 1 Moon Shot is ‘Go’ for Monday Morning Launch from Kennedy Space Center
ALL POINTS CEO PHIL MONKRESS: Our Neighbors Ushering in Next Generation of American Space TravelRelated Story:
ALL POINTS CEO PHIL MONKRESS: Our Neighbors Ushering in Next Generation of American Space Travel
Artemis 1 Launch Countdown Now Underway for Monday Morning Blastoff for the MoonRelated Story:
Artemis 1 Launch Countdown Now Underway for Monday Morning Blastoff for the Moon
Meet the Teams of Experts Supporting SLS Launch and Orion’s First Trip Around the MoonRelated Story:
Meet the Teams of Experts Supporting SLS Launch and Orion’s First Trip Around the Moon
NASA engineers are evaluating data gathered during the Artemis I launch attempt Monday, Aug. 29, when teams could not get the rocket’s engines to the proper temperature range required to start the engines at liftoff and ran out of time in the two-hour launch window to continue. While managers have not yet set a date for the next launch attempt, the earliest possible opportunity is Friday, Sept. 2, during a two-hour launch window that opens at 12:48 p.m.