TRAFFIC ADVISORY: Virgin Trains Construction and Lane Closure Update for State Road 528 Extension
By Space Coast Daily // January 22, 2020
Motorists should drive with extra caution through work zones and adhere to posted detour signs and speed limits

BREVARD COUNTY, FLORIDA – Virgin Trains, formerly Brightline, announced upcoming lane closures and work zone information for construction from Orlando to Brevard County.
Motorists should drive with extra caution through work zones and adhere to posted detour signs and speed limits.
Virgin Trains is the first privately funded passenger rail system in America in over a century and the company said it is designed to reinvent travel and take cars off the road by connecting city pairs and congested corridors that are too close to fly and too long to drive.
Providing fast, efficient, hospitality-driven transportation featuring the latest in customer-friendly amenities, Virgin Trains currently operates in Florida between Miami, Fort Lauderdale and West Palm Beach, with plans to expand to Orlando, Boca Raton, Aventura and PortMiami.
Railroad construction information can also be found HERE.
CONSTRUCTION AND LANE CLOSURE UPDATE
BREVARD COUNTY
Beachline Expressway/SR 528
Eastbound Beachline Expressway/SR 528 between SR 407 and I-95 (milepost 36-42)
Continuous day-time shoulder closure, 7 a.m. to 5 p.m.
Detour Information:
• Northbound I-95 traffic wishing to access eastbound Beachline Expressway/SR 528 will be directed to exit at SR 524 (exit 202), travel east on SR 524 to Industry Rd. and travel north on Industry Rd. to access eastbound Beachline Expressway/SR 528.
Railroad Crossings:
Sebastian – Railroad Crossing at Barefoot Blvd.
Day-time median closure, 7 a.m. to 7 p.m., Monday, February 3.
SR 417 and Beachline Expressway/SR 528
Northbound SR 417 exit ramp to eastbound and westbound SR 528 (Exit 26)
Continuous day-time shoulder closure, 7 a.m. to 7 p.m.
Northbound SR 417 between Dowden Rd. and SR 528 (milepost 24 to 26)
Northbound SR 417 exit ramp to eastbound & westbound SR-528 (Exit 26)
Night-time slow roll closure, 3 a.m. to 5 a.m., Monday, February 3 to relocate a crane.
Southbound SR 417 at SR 528 (milepost 24 to 22)
Continuous day-time shoulder closure, 7 a.m. to 7 p.m.
Southbound SR 417 between SR 528 and Dowden Rd. (milepost 26 to 24)
Eastbound Beachline Expressway/SR 528 at Narcoossee Rd.
Eastbound Beachline Expressway/SR 528 exit ramp to Narcoossee Rd. (Exit 13)
Extended single lane closure on exit ramp through 2021 for bridge work.
Eastbound Beachline Expressway/SR 528 exit ramp to Narcoossee Rd. (Exit 13)
Continuous day-time shoulder closure, 7 a.m. to 7 p.m.
Detour Information:
• Eastbound Beachline Expressway/SR 528 traffic wishing to access Narcoossee Rd. (Exit 13) will be directed to exit one exit earlier at Goldenrod Rd. (Exit 12), travel north on Goldenrod Rd. to Lee Vista Blvd. and travel east on Lee Vista Blvd. to access Narcoossee Rd.
Beachline Expressway/SR 528
Eastbound Beachline Expressway/SR 528 between Narcoossee Rd. and SR 417 (milepost 13-15)
Continuous day-time shoulder closure, 7 a.m. to 7 p.m.
Eastbound Beachline Expressway/SR 528 between SR 417 and Innovation Way (milepost 16-18)
Continuous day-time shoulder closure, 7 a.m. to 7 p.m.
Eastbound Beachline Expressway/SR 528 between Dallas Blvd. and SR 520 (milepost 27-28)
Continuous day-time shoulder closure, 7 a.m. to 7 p.m.
Westbound Beachline Expressway/SR 528 between SR 520 and Dallas Blvd. (milepost 28-27)
Continuous day-time shoulder closure, 7 a.m. to 7 p.m.
CLICK HERE FOR BREVARD COUNTY NEWS